Adapted Bathrooms and Kitchens from survey to installation we will ensure that the process is as easy and convenient as possible using quality products and qualified artisans.

Using AKW Ltd as our supplier, we can guarantee that we have the best product, the best warranty and the best support and advise when needed and who remain leaders in the adapted works material supply chain.

Disability Adapted Bathrooms

Generally dependent on the size of bathroom and the materials specified or if a pump or drain alteration is required, we can survey and from start to finish complete a full wet room within five working days, a guide to the programme below.

Day 1

Remove wall tiles and old sanitary leaving WC for use and plaster or board walls if needed, plus remove or install any replacement M&E items.

Day 2

Prepare floor to receive tray or former in concrete or timber floors and align and install all the wastes and drain connections.

Day 3

Apply wall boards or tiles and fit the new wash hand basin and prepare remaining walls and ceilings for decoration.

Day 4

Install the new flooring over the former or up to the tray and at the same time replace the WC pan with new, fit any accessories such as hand rails, seat etc.

Day 5

Decorate remaining walls and ceiling final coat and wash down all wall boards or tiles and leave room clean and tidy allowing the Electrician and plumber to then test and provide certification.

Disability adapted kitchens

A kitchen is generally 6-10 days again dependent on specification and room size.

If you are looking for peace of mind from start to finish and a quality end product, then telephone ADAPTED BATHROOMS AND KITCHENS for your FREE QUOTATION or complete the online survey request form by following the link.

We can also provide a service to any of your Building or Decorating requirements, so feel free to ask?